Overview
Pre-Work Criteria define what information must be provided before a technician can start a Work Order of this Type. Required fields and optional checklists help ensure safety and compliance before work begins.
Configure Pre-Work Criteria
Select the Gear icon in the top navigation bar, and then select Admin Mode.
Select Asset & Work Management > Work Order Types.
In the Work Order Type Finder, select the Work Order Type you want to configure, and then select View.
Select the Pre-Work Criteria card.
Require specific fields before work can start
- Select any fields that must be completed before the technician can start the Work Order. Available fields may include:
- Due Date
- Lead Assigned To
- Estimate (Hours)
- Reason for Work
- User Defined Fields (UDFs)
- Requested By
To require safety documentation, select Require Safety Documentation.
Pre-Work Checklists
A Pre-Work Checklist is a structured set of steps a technician must complete before LLumin allows the Work Order to be created. These checklists are commonly used to document:
- Safety conditions
- Environmental or facility conditions (temperature, humidity, weather)
- Operator or technician readiness (PPE checks, health checks)
- Site-specific requirements
New or updated checklists apply instantly to all Work Orders of this Type.
Enable the Pre-Work Checklist
Select Enable Pre-Work Checklist.
Create a Step Group
Select Add Step Group.
Enter a name for the group, such as Safety Checks or Environmental Readings.
Add a Step to the Group
In the Step Group, select Add Step.
In the Newt Step window, enter the Step Description.
Select a Data Type. The Data Type determines how technicians enter information (for example: Numeric, Checkbox, Date, Signature, File Upload).
- After selecting a Data Type, LLumin displays additional configuration fields depending on the type. Examples include:
- Unit of Measure (UOM)
- Default value
- Minimum and maximum allowed values
- Required flag
Save to Asset Field
(Optional) Attach a file to the step. This is useful for diagrams, documents, or images technicians should reference.
- Select OK at the bottom of the window to save the step.
- Add more steps or groups as needed.
Select Save.
Pre-Work Criteria for this Work Order Type are now configured.